Co-financiers of Bac Ai Pumped Storage Hydropower Plant Project conduct project appraisal

18/10/2023 11:03:25

On October 16, in Hanoi, Mr. Nguyen Xuan Nam - EVN Deputy General Director worked with the co-financiers delegation of the Bac Ai Pumped Storage Hydropower Plant Project. This was the first working session in the sponsor group’s project appraisal program.

The sponsor group includes representatives from French Development Agency (AFD), German Development Bank (KfW), Japan International Cooperation Agency (JICA), European Investment Bank (EIB).

This is a joint working trip of the sponsors to conduct a site visit in order to clarify the relevant viewpoints and contents of the Bac Ai Pumped Storage Hydropower Plant Project, discuss the draft Term Sheet and enhance coordination among the co-financiers. 

Mr. Nguyen Xuan Nam - EVN Deputy General Director emphasized that this is EVN's first pumped storage hydropower project, contributing to Vietnam's commitment realization at COP26. Mr. Nguyen Xuan Nam hoped the sponsor group will actively coordinate with EVN's specialized departments to complete the project appraisal on schedule.

EVN Deputy General Director – Mr. Nguyen Xuan Nam delivered a speech at the working session

On behalf of the sponsor group, Mr. Hugo Pierrel - AFD Vietnam Deputy Director thanked Vietnam Electricity for actively coordinating and fulfilling commitments in preparing for project appraisal. During the appraisal, the sponsor group will work seriously, objectively and complete this important project's appraisal on time.

Mr. Hugo Pierrel - AFD Vietnam Deputy Director (in the middle) exchanged information on the appraisal program of Bac Ai Pumped Storage Hydropower Plant Project 

At the meeting, the sponsor group and specialized departments, Power Projects Management Board 3 (EVNPMB3) and Power Engineering Consulting Joint Stock Company 4 (EVNPECC4) exchanged information related to the project appraisal.

According to the plan, from October 16-20, the working team will conduct technical and financial-economic project appraisal. This is a necessary step for the co-financiers to make a lending decision to the project.

The Bac Ai Pumped Storage Hydropower Plant Project is included in the list of power sources projects approved by the Prime Minister in Decision No. 428/QD-TTg dated March 18, 2016 on approving the adjustment of the National Power Development Plan for 2011-2020 period with vision to 2030 (adjusted Power Plan VII).

The project is of great importance to the national power system, especially in the context where many renewable energy power plants (solar, wind power) have been put into operation in the power system. The main task is to generate power to cover the peak load of the system, helping reduce the gap (flatten the load curve) by mobilizing pumping capacity during off-peak hours and generating electricity during peak hours.

Dự án Nhà máy Thuỷ điện tích năng Bác Ái

Bac Ai Pumped Storage Hydropower Plant Project

Investor: Vietnam Electricity (EVN)

Project Management: Power Projects Management Board 3 (EVNPMB3)

Location: Phuoc Tan and Phuoc Hoa communes, Bac Ai district, Ninh Thuan province

Engineering Consultant: Power Engineering Consulting Joint Stock Company 4 (EVNPECC4)

Project Scale

  1. Upper Reservoir Dam
  • CFRD dam, height 52.3m, length over 1,000m
  • Useful capacity: 8.99 million m3
  1. Underground Powerhouse

- Number of units: 4 (Reversible pump-turbine units)

- Type: Fixed speed unit

- Turbine-Pump:

  • Turbine maximum discharge at design head                 : 86.33m3/s
  • Turbine maximum head                                                : 440.64 m
  • Turbine design head                                                      : 405.27m
  • Turbine minimum head                                                 : 359.23 m
  • Pump maximum head                                                    : 448.75m
  • Pump flow discharge at maximum head                       : 56.55 m3/s
  • Pump minimum head                                                     : 380.95m
  • Pump flow discharge at minimum head                        : 79.33 m3/s

- Generator-Motor:

  • Rated generator/motor output                                       : 300MW/332MW
  • Rated voltage                                                                : 18kV
  • Rated speed                                                                   : 375 rpm
  • Step-up transformer:
  • Rated capacity                                                               : 355/355/710MVA
  • Ratio                                                                              : 18/ 18/500± (8x1.25%) kV
  1. 500kV switchyard
  • Type: outdoor AIS
  • Insulation: SF6
  • Diagram: One and a half scheme
  • Number of circuit breakers: 06
  • Rated voltage: 500kV
  1. Transmission line
  • Voltage level: 500kV
  • Number of circuits: 1 double circuit, using 4x330mm2 ACSR conductor, length of about 19km
  • Starting point: 500kV busbar of 500kV switchyard of Bac Ai Pumped Storage Hydropower Plant
  • Ending point: 500kV Ninh Son substation.

EVN.COM.VN

Related article

500kV Hoa Binh Substation Upgraded to 1,800MVA, Strengthening Power Supply for Northern Vietnam Ahead of This Year’s Peak Heat Season

500kV Hoa Binh Substation Upgraded to 1,800MVA, Strengthening Power Supply for Northern Vietnam Ahead of This Year’s Peak Heat Season

At 20:22 on April 29th 2026, the National Power Transmission Corporation (EVNNPT), in coordination with the Power Transmission Project Management Board (NPTPMB) and the National Power System and Market Operation Co., Ltd. (NSMO), successfully energized the project to upgrade the capacity of the 500kV Hoa Binh Substation, increasing its capacity from 1,350MVA to 1,800MVA.

Announcement of Liberation Day (30th April) and International Labor Day (1st May) holidays 2026

Announcement of Liberation Day (30th April) and International Labor Day (1st May) holidays 2026

Dear valued Shareholders, Partners and Customers, please be informed that our offices will be closed during the Liberation Day (30th April) and International Labor Day (1st May) holidays as following

Announcement of Hung Kings’ Commemoration Day 2026

Announcement of Hung Kings’ Commemoration Day 2026

Dear valued Shareholders, Partners and Customers, please be informed that our offices will be closed during the Hung Kings' Commemoration Day holiday as following:

EVNNPT Labor Union Supports Construction Site, Accelerates Completion of the 500kV Hoa Binh Substation Capacity Upgrade Project on Schedule

EVNNPT Labor Union Supports Construction Site, Accelerates Completion of the 500kV Hoa Binh Substation Capacity Upgrade Project on Schedule

On April 9th 2026, in Phu Tho, the Labor Union of the National Power Transmission Corporation (EVNNPT) visited and encouraged employees of the Power Transmission Project Management Board (NPTPMB), along with contractors working on the 500kV Hoa Binh Substation Capacity Upgrade Project—one of EVNNPT’s key and urgent power transmission projects.

Investment of VND 3,000 billion to develop a waste-to-energy plant in Khanh Son

Investment of VND 3,000 billion to develop a waste-to-energy plant in Khanh Son

On the morning of March 19th, the Vietnam Bank for Agriculture and Rural Development (Agribank), in coordination with Vietnam Environment Joint Stock Company (a member of the Amaccao Group), held a signing ceremony for a credit agreement and an insurance contract to implement the Khanh Son waste-to-energy plant project (Hoa Khanh Ward, Da Nang City).

Power Engineering Consulting Joint Stock Company 4

11 Hoang Hoa Tham St, Nha Trang Ward, Khanh Hoa Province, Vietnam

(+84) 258 - 3563999

(+84) 258 - 3563888

tv4@pecc4.vn

Northern Affiliate

Lot 3, TT4, Alley 183, Hoang Van Thai St, Phuong Liet Ward, Ha Noi City

(+84) 24 - 22183 870

(+84) 24 - 62855759

cnpb@pecc4.vn

Number of visits: 2827321

Copyright © 2022 Power Engineering Consulting Joint Stock Company 4

server-notice