03/07/2019 00:00:00
Project name
Da Mi Floating Solar Power Plant (47.5MWp)
Location
Binh Thuan province
Name of Client
Da Nhim - Ham Thuan - Da Mi Hydropower Company
Implementation time
2016 - 2019 (COD in June 01, 2019)
EVNPECC4 provided Consulting Services
- Supplement report to Provincial Power Development Plan of Binh Thuan from 2011 to 2015 with visions extended to 2020.
- Investigation, Feasibility Study Report.
- EPC Bidding documents preparation.
- Technical Design.
Characteristic of the Plant
The first Floating Solar Power Plant in Vietnam, put into commercial operation from June 01, 2019.
Dear Valued Clients, Partners and Shareholders On the occasion of the 50th Anniversary of Power Engineering Consulting Joint Stock Company 4 (PECC4), We would like to extend our heartfelt gratitude for your trust, partnership, and invaluable support throughout our journey of growth and development.
Recently, a delegation from the French Embassy in Vietnam and the French Development Agency (AFD) held a working session with the National Power Transmission Corporation (EVNNPT) and visited the 500kV Binh Duong 1 Substation.
Continuing its efforts to provide training and enhance the skills required to use software supporting surveying and engineering consulting activities, on 19th June 2026, Power Engineering Consulting Joint Stock Company No. 4 (EVNPECC4) signed a training contract with the Research and Development of Software in Construction (RDSIC) under the Hanoi University of Civil Engineering to organize Building Information Modeling (BIM) training courses for EVNPECC4's professional consulting engineers.
To: Valued Customers, Partners, Shareholders, Investors, and Employees of Power Engineering Consulting Joint Stock Company 4 (PECC4)
At 20:22 on April 29th 2026, the National Power Transmission Corporation (EVNNPT), in coordination with the Power Transmission Project Management Board (NPTPMB) and the National Power System and Market Operation Co., Ltd. (NSMO), successfully energized the project to upgrade the capacity of the 500kV Hoa Binh Substation, increasing its capacity from 1,350MVA to 1,800MVA.
11 Hoang Hoa Tham St, Nha Trang Ward, Khanh Hoa Province, Vietnam
(+84) 258 - 3563999
(+84) 258 - 3563888
tv4@pecc4.vn
Lot 3, TT4, Alley 183, Hoang Van Thai St, Phuong Liet Ward, Ha Noi City
(+84) 24 - 22183 870
(+84) 24 - 62855759
cnpb@pecc4.vn
Copyright © 2022 Power Engineering Consulting Joint Stock Company 4